For The SR 76 Middle Project, the existing alternative was selected as the preferred alternative with the signing of the Final EIR/EIS on Nov. 26, 2008. For the SR 76 East project, a range of alternatives is being studied and the impacts of those alternatives will be addressed in the Draft Environmental Document in Spring 2010. The final build alternative will be chosen in conjunction with the participating federal agencies in conformance with NEPA 404 guidance. |