I-5/SR 56 Interchange Project

This project will provide a better, less-congested freeway connection between I-5 and SR 56. It would do this by reducing congestion associated with traveling between I-5 and SR 56. This project would help to improve travel times and address congestion on I-5, SR 56, and local arterials such as El Camino Real, caused by traffic going from Westbound SR 56 to Northbound I-5 or Southbound I-5 to Eastbound SR 56.

Preliminary design work has begun and includes:

  • A traffic study was completed which includes traffic counts and volume forecasts for the year 2030.
  • A bike path feasibility study was completed in 2007 to review the possibility of extending the SR 56 bike path west of I-5.
  • Preliminary planning of the highway configuration
  • Community Workshops & Community Planning Group Presentations

Funding

Project funding for the Project Report (PR) and Environmental Document (ED) will be taken from a combination of Federal sources and City of San Diego funds. Federal Funding sources include Coordinated Borders Infrastructure (CBI), Federal High Priority Demonstration (DEMO), and Surface Transportation funds. Approximately $9.5 million has been programmed for the I-5/SR-56 Interchange Project. Design and construction for the project would be dependent on completion of the PR/ED phase.

Schedule

A Draft Environmental Document is expected to be available for public review in fall 2010. The Project Report/Environmental Document phase will build on the previous studies while exploring new solutions. A Value Analysis Report was completed in May 2002. This study involved community representatives and agency staff from the city of San Diego, Caltrans, and the San Diego Association of Governments. A Project Study Report was completed by Caltrans in December 2000. That document discussed a Freeway Connectors alternative, a Local Streets alternative, and the No Build alternative.

Additional Links

Project Fact Sheets

Interstate 5/State Route 56 Interchange Project - Fact Sheet (June 2009)

Project Alternatives
Auxiliary Lane Alternative
Direct Connector Alternative
Hybrid Connector Alternative
Modified Hybrid Connector Alternative
No Build Alternative

Environmental Documents

Meetings/Presentations/Displays

Schematic Displays

Travel Time Displays
Visual Simulations

Traffic Noise Abatement Process

Traffic Operational Exhibits

Portofino Site Concept Exhibit
Steering Committee Project Notebook



Click Here to View
Direct Connector Alternative
Video Simulation




Click Here to View
Auxiliary Lane Alternative
Video Simulation



Receive updates about the I-5 Corridor improvements
If you have a question, comment or would like to sign up to receive periodic updates about the I-5 Corridor, click the link below.