I-5/SR 56 Interchange Project
This project will provide a better, less-congested freeway connection between I-5 and SR 56. It would do this by reducing congestion associated with traveling between I-5 and SR 56. This project would help to improve travel times and address congestion on I-5, SR 56, and local arterials such as El Camino Real, caused by traffic going from Westbound SR 56 to Northbound I-5 or Southbound I-5 to Eastbound SR 56.
Preliminary design work has begun and includes:
- A traffic study was completed which includes traffic counts and volume forecasts for the year 2030.
- A bike path feasibility study was completed in 2007 to review the possibility of extending the SR 56 bike path west of I-5.
- Preliminary planning of the highway configuration
- Community Workshops & Community Planning Group Presentations
Funding
Project funding for the Project Report (PR) and Environmental Document (ED) will be taken from a combination of Federal sources and City of San Diego funds. Federal Funding sources include Coordinated Borders Infrastructure (CBI), Federal High Priority Demonstration (DEMO), and Surface Transportation funds. Approximately $9.5 million has been programmed for the I-5/SR-56 Interchange Project. Design and construction for the project would be dependent on completion of the PR/ED phase.
Schedule
A Draft Environmental Document is expected to be available for public review in fall 2010. The Project Report/Environmental Document phase will build on the previous studies while exploring new solutions. A Value Analysis Report was completed in May 2002. This study involved community representatives and agency staff from the city of San Diego, Caltrans, and the San Diego Association of Governments. A Project Study Report was completed by Caltrans in December 2000. That document discussed a Freeway Connectors alternative, a Local Streets alternative, and the No Build alternative.
Additional Links
Interstate 5/State Route 56 Interchange Project - Fact Sheet (June 2009)
Schematic Displays
Travel Time Displays
Traffic Noise Abatement Process
Traffic Operational Exhibits
Portofino Site Concept Exhibit
|  |

Click Here to View Direct Connector Alternative Video Simulation

Click Here to View Auxiliary Lane Alternative Video Simulation
|
Receive updates about the I-5 Corridor improvements
|
|
|
If you have a question, comment or would like to sign up to receive periodic updates about the I-5 Corridor, click the link below.
|
|
|
|