I-5 Express Lanes Project

Caltrans and the Federal Highway Administration (FHWA) have identified the Express Lanes Only (8+4 with Buffer/Striping) option as the Locally Preferred Alternative for the I-5 Express Lanes Project after extensive public outreach and consideration of input from the community and resource agencies. This option would add two Express Lanes in each direction from La Jolla to Oceanside, separated from the existing general purpose lanes by a painted, striped buffer. The Express Lanes will accommodate carpools, vanpools, and single occupancy vehicles using FasTrak®. The project will ensure a reliable travel time along the length of the corridor and provide transportation flexibility to accommodate future demands.

Of the build alternatives studied in the project’s Draft Environmental Impact Report, all of which were a significant improvement over the existing condition, the Locally Preferred Alternative offers the appropriate balance of benefits and costs to the environment and community. The Locally Preferred Alternative meets the purpose and need of the project; has the least impacts to natural resources; requires the fewest property relocations; and has the lowest construction costs.

What's New

Fact Sheet: I-5 Express Lanes Project (Posted 7/7/11)

News Release: Caltrans and FHWA Identify Express Lanes Only Option as Locally Preferred Alternative for I-5 Express Lanes Project (Posted 7/7/11)

Maps: Location and phasing of transit, environmental and community enhancements planned in the North Coast Corridor (Posted 4/29/11)

FAQ #4: When will rail transit improvements start? (Posted 4/20/11)

Newsletter: I-805 HOV/Carroll Canyon Road Extension Project (Posted 4/13/11)

FAQ #3: How do proposed transportation improvements meet corridor demands? (Posted 4/8/11)

FAQ #2: How do the corridor's characteristics influence proposed transportation improvements? (Posted 4/5/11)

FAQ #1: What transportation improvements are planned? (Posted 4/1/11)

Project Update: Diamond Grinding Pilot Project Begins

Press Coverage: UT Editorial Board Supports Express Lanes Project

Planning Documents

Express Lanes Project:

Draft Environmental Document

Public Works Plan

Corridor System Management Plan


I-5/Genesse Interchange Reconstruction Project:

Initial Study with Proposed Negative Declaration/Environmental Assessment

NCC Program Newsletter

Map

I-5 North Coast Corridor

View Map View Video View Newsletter in English View English View Spanish
sandaga